Certified 2025 BMW M4 Competition xDrive

Stock: T42185AVIN: WBS43BA00SCS94934

Stock: T42185A VIN: WBS43BA00SCS94934

Certified 2025 BMW M4 Competition xDrive

Detailed Pricing
Final Price:
$79,895
Overview
T42185A
Stock
WBS43BA00SCS94934
VIN
19,573
Miles
Convertible
Body
AWD
Drivetrain
Brooklyn Grey Metallic
Exterior
Fiona Red/Black
Interior
112.5
Wheelbase
Twin Turbo Premium Unleaded I-6 3.0 L/183
Engine
Gas
Fuel
8-Speed Automatic w/OD
Transmission
2
Doors
22*
Highway MPG
16*
City MPG
Description
Elevate your driving experience with this stunning 2025 BMW M4 Competition. Meticulously engineered to deliver exceptional performance and unparalleled style, this vehicle is a true testament to BMW's commitment to automotive excellence.

- Front Ventilated Seats
- Carbon Fiber Trim
- Neck Warmer
- Galvanic Controls
- Brooklyn Grey Metallic Exterior
- Fiona Red/Black, Full Merino Leather Upholstery
- Driving Assistance Professional Package
- Parking Assistance Package
- Executive Package

Powered by a potent 3.0L I6 Turbocharged engine mated to an 8-Speed Automatic Sport transmission, this M4 Competition delivers an exhilarating 523 horsepower and seamless all-wheel-drive performance. Experience the thrill of the open road with exceptional fuel efficiency, earning an EPA-estimated 16 city/22 highway MPG.

Elevate your driving experience with the premium features and advanced technology that set this M4 Competition apart. Enjoy the comfort and style of the full Merino leather upholstery, the convenience of Remote Engine Start, and the enhanced visibility of the BMW Curved Display with Head-Up Display.

This vehicle has been meticulously inspected and certified to ensure it meets the highest standards of quality and performance. Trust that you are investing in a exceptional driving experience that will exceed your expectations.

Thank you for making O.C. Welch Ford your Dealer of choice. Our pricing includes all dealer fees of $899 but excludes taxes, title, and license fees. Contact Kim Wells at 843-288-0191 or email me at [email protected]

Features
Blind Spot Monitor

Blind Spot Monitor

Bluetooth®

Bluetooth®

Brake Assist

Brake Assist

Collision Warning

Collision Warning

Ventilated Seats

Ventilated Seats

Cruise Control

Cruise Control

Hands-Free Liftgate

Hands-Free Liftgate

Heated Seats

Heated Seats

Heated Side Mirrors

Heated Side Mirrors

Keyless Entry

Keyless Entry

Lane Keep

Lane Keep

Leather Seats

Leather Seats

Memory Seats

Memory Seats

Navigation

Navigation

Parking Assist

Parking Assist

Power Seat

Power Seat

Power Windows

Power Windows

Push Button Starting

Push Button Starting

Rain Sensing Wipers

Rain Sensing Wipers

Rearview Camera

Rearview Camera

Satellite Radio

Satellite Radio

Security System

Security System

Side-Impact Air Bags

Side-Impact Air Bags

Stability Control

Stability Control

WiFi Hotspot

WiFi Hotspot

Remote Start

Remote Start

Heated Steering Wheel

Heated Steering Wheel

Details
Features
FRONT VENTILATED SEATS
WHEELS: 19 X 9.5 FR/20 X 10.5 RR FORGED BLACK -inc: Style 826M M dual-spoke
DRIVING ASSISTANCE PROFESSIONAL PACKAGE -inc: Active Driving Assistant Pro Extended Traffic Jam Assistant For limited access highways
FIONA RED/BLACK FULL MERINO LEATHER UPHOLSTERY
BROOKLYN GREY METALLIC
EXECUTIVE PACKAGE -inc: Remote Engine Start BMW Curved Display w/HUD Heated Steering Wheel
M SPORT SEATS (STD)
M COMPOUND BRAKES W/RED CALIPERS
PARKING ASSISTANCE PACKAGE -inc: Parking Assistant Plus
NECK WARMER
CARBON FIBER TRIM
GALVANIC CONTROLS
Turbocharged
All Wheel Drive
Active Suspension
Power Steering
ABS
4-Wheel Disc Brakes
Brake Assist
Locking/Limited Slip Differential
Aluminum Wheels
Tires - Front Performance
Tires - Rear Performance
Heated Mirrors
Power Mirror(s)
Integrated Turn Signal Mirrors
Power Folding Mirrors
Rear Defrost
Intermittent Wipers
Variable Speed Intermittent Wipers
Rain Sensing Wipers
Rollover Protection Bars
Convertible Soft Top
Daytime Running Lights
Automatic Headlights
Headlights-Auto-Leveling
LED Headlights
Automatic Highbeams
AM/FM Stereo
MP3 Capability
Steering Wheel Audio Controls
Auxiliary Audio Input
HD Radio
Satellite Radio
Requires Subscription
Premium Sound System
Bluetooth Connection
Bucket Seats
Power Driver Seat
Power Passenger Seat
Heated Front Seat(s)
Pass-Through Rear Seat
Rear Bench Seat
Adjustable Steering Wheel
Trip Computer
Power Windows
Leather Steering Wheel
Keyless Entry
Power Door Locks
Keyless Start
Hands-Free Liftgate
Universal Garage Door Opener
Cruise Control
Climate Control
Multi-Zone A/C
A/C
Leather Seats
Auto-Dimming Rearview Mirror
Driver Vanity Mirror
Passenger Vanity Mirror
Driver Illuminated Vanity Mirror
Passenger Illuminated Visor Mirror
Floor Mats
Mirror Memory
Seat Memory
Smart Device Integration
Telematics
WiFi Hotspot
Navigation System
Driver Adjustable Lumbar
Passenger Adjustable Lumbar
Security System
Immobilizer
Traction Control
Stability Control
Front Side Air Bag
Rear Parking Aid
Blind Spot Monitor
Cross-Traffic Alert
Lane Departure Warning
Lane Keeping Assist
Front Collision Mitigation
Driver Monitoring
Tire Pressure Monitor
Driver Air Bag
Passenger Air Bag
Passenger Air Bag Sensor
Knee Air Bag
Back-Up Camera
Come visit us at www.goseeoc.com www.goseeocford.com South Carolina's Largest Ford Lincoln dealership since 1985
Exterior
Auto On/Off Projector Beam Led Low/High Beam Auto-Leveling Directionally Adaptive Auto High-Beam Daytime Running Lights Preference Setting Headlamps w/Delay-Off
Black Grille
Black Power Heated Side Mirrors w/Driver Auto Dimming, Power Folding and Turn Signal Indicator
Black Side Windows Trim and Black Front Windshield Trim
Body-Colored Door Handles
Body-Colored Front Bumper
Body-Colored Rear Bumper w/Black Rub Strip/Fascia Accent
Cornering Lights
Fixed Rear Window w/Defroster
Front License Plate Bracket
Galvanized Steel/Aluminum/Composite Panels
Headlights-Automatic Highbeams
LED Brakelights
Light Tinted Glass
Perimeter/Approach Lights
Power Convertible Top w/Lining, Glass Rear Window, Automatic Roll-Over Protection, Manual Wind Blocker and Top
Rocker Panel Extensions
Speed Sensitive Rain Detecting Variable Intermittent Wipers
Tire Mobility Kit
Tires: 275/35R19 Fr & 285/30R20 Rr High Performance -inc: Staggered
Trunk Rear Cargo Access
Wheels: 19 x 9.5 Fr/20 x 10.5 Rr (Style 826M) -inc: M dual-spoke bi-color forged
Interior
12-Way Driver Seat -inc: Manual Cushion Extension and Power Rear Seat Easy Entry
12-Way Passenger Seat -inc: Manual Cushion Extension and Power Rear Seat Easy Entry
16 Speakers
2 LCD Monitors In The Front
3 12V DC Power Outlets
40-20-40 Folding Bench Front Facing Fold Forward Seatback Rear Seat
600w Premium Amplifier
Air Filtration
Apple CarPlay & Android Auto Compatibility
Artti Real-Time Traffic Display
Bluetooth Wireless Phone Connectivity
BMW Assist eCall
BMW TeleServices
Cargo Area Concealed Storage
Cargo Features -inc: Tire Mobility Kit
Cargo Space Lights
Carpet Floor Trim and Carpet Trunk Lid/Rear Cargo Door Trim
Compass
Connected Package Pro
ConnectedDrive Services
Cruise Control w/Steering Wheel Controls
Day-Night Auto-Dimming Rearview Mirror
Delayed Accessory Power
Digital Appearance
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illumination, Driver And Passenger Auxiliary Mirror
Driver Foot Rest
Driver Information Center
Extended Merino Leather Upholstery
Fade-To-Off Interior Lighting
FOB Controls -inc: Keyfob Cargo Access, Keyfob Window Activation and Keyfob Sunroof/Convertible Roof Activation
Front And Rear Map Lights
Front Center Armrest and Rear Center Armrest w/Pass-Thru
Front Cupholder
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
Full Cloth Headliner
Full Floor Console w/Covered Storage, Mini Overhead Console and 3 12V DC Power Outlets
Garage Door Transmitter
Gauges -inc: Speedometer, Odometer, Engine Coolant Temp, Tachometer, Turbo/Supercharger Boost, Oil Level, Oil Temperature, Trip Odometer and Trip Computer
harman/kardon Surround Sound System
Heated Front Seats
HVAC -inc: Underseat Ducts and Console Ducts
Illuminated Locking Glove Box
Immobilizer
Instrument Panel Covered Bin, Driver And Passenger Door Bins
Interior Trim -inc: Aluminum Instrument Panel Insert and Piano Black/Metal-Look Interior Accents
Leather/Metal-Look Gear Shifter Material
Leatherette Door Trim Insert
Lumbar Support
M Sport Seats
Manual Adjustable Front Head Restraints and Fixed Rear Head Restraints
Manual Tilt/Telescoping Steering Column
Memory Settings -inc: Driver Seat, Door Mirrors, Audio and HVAC
Navigation
Outside Temp Gauge
Perimeter Alarm
Personal eSIM 5G
Power 1st Row Windows w/Front And Rear 1-Touch Up/Down
Power Door Locks w/Autolock Feature
Power Front Seats
Power Fuel Flap Locking Type
Power Rear Windows
Proximity Key For Doors And Push Button Start And Smart Device Proximity Key
Radio w/Seek-Scan, Clock, Speed Compensated Volume Control, Steering Wheel Controls, Voice Activation, Radio Data System and External Memory Control
Radio: AM/FM Audio System
Rear Cupholder
Redundant Digital Speedometer
Remote Keyless Entry w/Integrated Key Transmitter, 2 Door Curb/Courtesy, Illuminated Entry, Illuminated Ignition Switch and Panic Button
Remote Releases -Inc: Comfort Access Proximity Cargo Access
SiriusXM w/360L -inc: 1 year platinum plan subscription
Smart Device Integration
Sport Leather Steering Wheel
Streaming Audio
Tracker System
Trip Computer
Valet Function
Voice Activated Dual Zone Front Automatic Air Conditioning
Widescreen Display
Window Grid Antenna
Mechanical
15.6 Gal. Fuel Tank
3.15 Axle Ratio
4-Wheel Disc Brakes w/4-Wheel ABS, Front And Rear Vented Discs, Brake Assist, Hill Hold Control and Electric Parking Brake
Automatic w/Driver Control Ride Control Sport Tuned Adaptive Suspension
Battery w/Run Down Protection
Dual Stainless Steel Exhaust w/Dark Chrome Tailpipe Finisher
Electric Power-Assist Speed-Sensing Steering
Electro-Mechanical Limited Slip Differential
Engine Auto Stop-Start Feature
Engine Oil Cooler
Engine: 3.0L 6-Cylinder TwinPower Turbo
Front And Rear Anti-Roll Bars
Gas-Pressurized Shock Absorbers
Multi-Link Rear Suspension w/Coil Springs
Part And Full-Time All-Wheel
Regenerative Alternator
Strut Front Suspension w/Coil Springs
Transmission w/Driver Selectable Mode, STEPTRONIC Sequential Shift Control w/Steering Wheel Controls and Oil Cooler
Transmission: 8-Speed Sport Automatic
Safety
ABS And Driveline Traction Control
Active Blind Spot Detection Blind Spot
Airbag Occupancy Sensor
Back-Up Camera
Collision Mitigation-Front
Driver And Passenger Side Airbag Head Extension, Driver And Passenger Knee Airbag
Driver Monitoring-Alert
DSC Electronic Stability Control (ESC)
Dual Stage Driver And Passenger Front Airbags
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
Frontal Collision Warning
Lane Keeping Assistant/Lane Departure Warning Lane Departure Warning
Lane Keeping Assistant/Lane Departure Warning Lane Keeping Assist
Outboard Front Lap And Shoulder Safety Belts -inc: Pretensioners
Park Distance Control Front And Rear Parking Sensors
Rear Collision Prevention
Side Impact Beams
Tire Specific Low Tire Pressure Warning
Similar Vehicles

2025 BMW 4 Series 430i

Stock: T43649A

Quick View

2021 Ford Bronco Badlands

Stock: P60240

Quick View

2024 Ford Bronco Heritage Edition

Stock: B42237

Quick View

2024 Ford Bronco Raptor

Stock: B47672

Quick View

Dealer FAQs

Can I get financed for an auto loan at O. C. Welch Ford Lincoln Inc.?

Getting financed with us is fast and fun. Whether you’ve always enjoyed a sterling credit history, are currently working on improving your credit score even more, or this is your first time buying a car, you can count on the friendly experts at O. C. Welch Ford Lincoln Inc. to make the whole process transparent and easy to understand. To learn more and get the ball rolling on the right loan for your unique financial situation, call 843-288-0100 or apply online now. 

What is the financing process like at O. C. Welch Ford Lincoln Inc.?

Easy and relaxed. Our primary goal is your total satisfaction, so we provide you with as much time and expert insight as you need to properly consider all of your loan options. This commitment to friendly, honest, and fair service is truly a breath of fresh air and ensures that you drive away happy, satisfied, and behind the wheel of the vehicle you've always wanted.

What are the steps in the financing process at O. C. Welch Ford Lincoln Inc.?

Great question. Securing a competitive loan from O. C. Welch Ford Lincoln Inc. takes only three easy steps. First up is to either apply online for pre-approval via our quick and convenient online credit application or call 843-288-0100. From here, one of our financing experts will connect with you to go over the details of your loan offers and ensure that you have everything you need to make a smart and informed decision.

After reviewing your proposed loan terms and consulting with our financial advisors and your trusted personal confidants (friends, family members, etc.), there is only one step left: Finalizing the perfect loan for you via a simple and respectful process. By following these three short steps, you can make the most of the best loan experience here in Hardeeville.

What is involved in securing an auto loan in Hardeeville SC?

The answer to this question includes a variety of factors, such as:

  • Your car's purchase price
  • Your trade in and equity position
  • If the vehicle you are purchasing is new or used
  • The length of your existing loan's life
  • Your current credit score
  • How much you are choosing to invest in a down payment

People from all around Hardeeville come to purchase a clean car, truck, or SUV from our used car lot each and every day. Most loans prepared by our team are entirely unique, so the factors that will shape your bank loan will depend on your specific situation, desires, and needs.

Our expert financial professionals are happy to find and present lots of great offers to ensure that you are in complete control and that you are receiving the best deal possible on the loan you need. Our customers make great and informed decisions based on all of their available options thanks to a perfectly transparent process that we take seriously.

Who can I call at O. C. Welch Ford Lincoln Inc. to get the financing process started?

Any of our amazing specialists will be more than happy to help you get the ball rolling on your dream car. All you have to do is dial 843-288-0100 when you have a few free moments and you'll soon see that getting approved for a car loan at O. C. Welch Ford Lincoln Inc. is quick, easy, and convenient.

* Pricing -  All vehicle pricing shown is assumed to be correct and accurate. Incentives, credit restrictions, qualifying programs, residency, and fees may raise, lower, or otherwise augment monthly payments. Additionally, incentives offered by the manufacturer are subject to change and may fluctuate or differ based on region and other considerations. Unless otherwise noted or specified, pricing shown does not include title, registration, or tax fees and costs.

MPG - Vehicle information, as well as features and other inclusions, may vary by model and are based exclusively on standard equipment. No claims, warranties, or guarantees have been made related to the accuracy of customer payments, model equipment, or vehicle pricing. Please call with any questions you might have and to reassert the accuracy of any information presented here.

© 2026 O. C. Welch Ford Lincoln Inc.